Lufter Sdn. Bhd

Formal request must be made to retrieve Lufter’s document. Please contact us. Thank you.

Resource Library

The documents available here are the latest, and approved for use. Documents such as SOP, MOS, Work Instructions and Guidelines are not approved for Distribution. Please approach Senior Management for Controlled Copy for Distribution.

Staff Resources

Departments

Resources

MEMO

  • L-HR-L-08-76 Restructuring and Reporting Line
  • L-HR-L-08-74 Public Holiday 2024 (Selangor, Penang, Johor and Sarawak)
  • L-HR-L-08-67 Company Panel Clinics
  • L-HR-L-08-65 Update Emergency Contacts
  • L-HR-L-08-61 Revise Friday Prayer Lunch Break
  • L-HR-L-08-60 Company Panel Clinics
  • L-HR-L-08-50 Emergency Leave Application
  • L-HR-L-08-47 Medical Leave Detailed Procedure
  • L-HR-L-08-46 Post Project Handover Procedure
 

NCAR

  • Alert NCAR (L-QA-NCAR-01-60)
  • Alert NCAR (L-QA-NCAR-01-52)
 

GENERAL

  • Staff Email (Lufter & Beluften) updated as of 18-Nov-2024

July 2022

  • Townhall 13-Jul-2022

August 2022

  • Townhall 30-Aug-2022

September 2022

  • Townhall 30-Sep-2022

November 2022

  • Townhall 17-Nov-2022

January 2023

  • Townhall 31-Jan-2023

August 2023

  • Townhall 25-Aug-2023

October 2023

  • Townhall 27-Oct-2023

March 2024

  • Townhall 11-Mar-2024

May 2024

  • Townhall 24-May-2024

October 2024

  • Townhall 21-Oct-2024
  • Employee Handbook
  • Vision, Mission, Core Values
  • Company Quality Objective FY2024
  • SWOT Analysis 2024
  • ISO 9001:2015 CERTIFICATION
  • General Orientation 2023
  • Organization Chart- Department (ORG-DEP-24-R00)
  • Organization Chart- Position (ORG-POS-24-R01)

E-MAIL

  • Incident Notification 

DRAWING

  • TMP-D-001 R00 Typical Detail – Ducting (190624)
  • TMP-D-001 R00 Typical Detail – IFO (190624)

VALIDATION

  • Pharmaniaga LifeScience
  • OasisEye Specialist
  • Subang Jaya Medical Centre

PROJECT FINAL REPORT

  • Final Report Pharmaniaga LifeScience
  • Final Report OasisEye Specialist
  • Final Report Subang Jaya Medical Centre
  • Client’s Enquiry / Proposed Tender Document Flow Chart

SOP

  • Operating at Site During Disease Outbreak
  • Operating in Office During Disease Outbreak

 

FORM

  • HR-F-015 R00 Health Declaration Form

Lufter Departments

  • QA-L-01  Document Master List

GENERAL

  • FOR-001 Minutes of Meeting
  • FOR-001 Sample Minutes of External Project Kick Off Meeting with Client – 1st Meeting and One Time Only
  • FOR-001 Sample Minutes of External Project Kick Off Meeting with Sub-Con – 1st Meeting and One Time Only
  • FOR-001 Sample Minutes of Progress Meeting – 2nd Meeting Onwards
  • FOR-002 Template Presentation for Internal & External Usage
  • FOR-003 Engineering Quotation Template
  • FOR-004 Lufter Project BOQ Template 
  • FOR-004 Lufter Project BOQ Template (Sample)
  • FOR-005 Sample Format for Lufter Form
  • FOR-006 Sample Format for Lufter Guidelines
  • FOR-007 Lufter Project Quotation Template
  • FOR-008 Sample Format for O&M (HVAC)
  • FOR-008 Sample Format for O&M (IFO)
  • FOR-008 Sample Format for O&M (Electrical)
  • FOR-008 Sample Format for O&M (Utilities)

LETTER 

  • FOR-L-001 Lufter Letterhead
  • FOR-L-002 Denying Liquidated Damage Letter
  • FOR-L-003 Notice of Delays Letter
  • FOR-L-004 Project Handover Letter Template
  • FOR-L-005 Keys Handover Letter Template
  • FOR-L-006 Invitation to CPC Inspection
  • FOR-L-007 Post CPC Inspection
  • FOR-L-008 Invitation to Defect Inspection
  • FOR-L-009 Request for CPC & 1st Moiety

SOP

  • PRO-SOP-02 R04 Design and Development (WM)
  • PRO-SOP-03 R04 Project Planning Control (WM)
  • PRO-SOP-04 R06 Inspection, Validation and Handover (WM)
  • PRO-SOP-05 R04 Control of Nonconforming Services (WM)

WORK INSTRUCTION

  • PRO-WI-01 R00 Project Drawing Production (WM)

GUIDELINES

  • PRO-GD-01 R00 Electrical Board Installation Guideline (WM)
  • PRO-GD-02 R00 Cleanroom Technical Cleaning Guideline (WM)
  • PRO-GD-03 R00 HVAC Air Balancing Guideline (WM)
  • PRO-GD-04 R00 Install Insulate Ducting System Guideline (WM)
  • PRO-GD-05 R01 Project Kick Off Meeting Guideline (WM)
  • PRO-GD-06 R01 Chilled Condenser Water Pipe Installation Guideline (WM)
  • PRO-GD-07 R01 Cleanroom Panel Installation Guideline (WM)
  • PRO-GD-08 R01 Project Preparation and Site Readiness Guideline (WM)
  • PRO-GD-09 R00 First Aid Guideline (WM)
  • PRO-GD-10 R00 Site Housekeeping Guideline (WM)
  • PRO-GD-11 R00 Site Demobilization Guideline (WM)
  • PRO-GD-12 R01 Site Safety Guideline (WM)
  • PRO-GD-13 R00 Equipment and Material Lifting Guideline (WM)
  • PRO-GD-14 R00 Lead Sheet & Cleanroom Test Guideline (WM)
  • PRO-GD-16 R00 Self-Levelling Floor Installation Guideline (WM)
  • PRO-GD-17 R00 Project Drawing Control Guideline (WM)
  • PRO-GD-20 R00 Installation, Testing and Commissioning Guideline (WM)

ISO FORM

  • QA-F-02 R02 Customer Satisfaction Survey
  • PRO-F-06 R04 Service Chit
  • PRO-F-07 R00 Checklist for Reviewing CPT report
  • PRO-F-08 R00 Checklist for Reviewing External Calibration Certificate
  • PRO-F-09 R00 Confirmation of Verbal Instruction
  • PRO-F-10 R00 Investigation Report
  • PRO-F-11 R01 Application For Inspection
  • PRO-F-12 R01 Project Material and Equipment List
  • PRO-F-13 R01 Project Report – Sample of Final Report
  • PRO-F-13 R01 Project Report – Sample of Progress Report
  • PRO-F-13 R01 Project Report
  • PRO-F-14 R01 General Material Receiving Checklist
  • PRO-F-15 R00 Condensing Unit Installation Verification
  • PRO-F-16 R00 Copper Pipe Installation Verification
  • PRO-F-17 R01 Copper Pipe Pressure Test Report
  • PRO-F-18 R00 Air Handling Unit & Fan Coil Unit Installation Verification
  • PRO-F-19 R00 Differential Pressure Gauge Installation Verification
  • PRO-F-20 R01 Filter Chamber Installation Verification
  • PRO-F-21 R00 HEPA Filter Installation Verification
  • PRO-F-22 R02 Ducting System Installation Verification
  • PRO-F-23 R01 Dampers Installation Verification
  • PRO-F-24 R00 Ventilation Fan Installation Verification
  • PRO-F-25 R00 Active Passbox Installation Verification
  • PRO-F-26 R00 Ceiling Installation Verification
  • PRO-F-27 R00 Door Installation Verification
  • PRO-F-28 R00 Emergency Eyewash & Shower Installation Verification
  • PRO-F-29 R00 Epoxy or PU Finished Floor Installation Verification
  • PRO-F-30 R00 Furniture & Fittings Installation Verification
  • PRO-F-31 R01 Marking Checklist
  • PRO-F-32 R00 Passive Passbox Installation Verification
  • PRO-F-33 R00 Sink Installation Verification
  • PRO-F-34 R01 Tiles Finished Floor & Wall Installation Verification
  • PRO-F-35 R01 Viewing Glass Installation Verification
  • PRO-F-36 R00 Vinyl Finished Floor Installation Verification
  • PRO-F-37 R00 Wall Installation Verification
  • PRO-F-38 R00 Door Operation Verification
  • PRO-F-39 R02 Drawing Transmittal List
  • PRO-F-40 R00 Extra Low Voltage System Installation Verification
  • PRO-F-41 R00 Chilled Water Pipe Installation Verification
  • PRO-F-42 R00 Cold Water Pipe Installation Verification
  • PRO-F-43 R00 Condenser Water Pipe Installation Verification
  • PRO-F-44 R00 Hot Water Pipe Installation Verification
  • PRO-F-45 R00 Pipe Insulation Installation Verification
  • PRO-F-46 R00 Pump & Motor Installation Verification
  • PRO-F-47 R01 Ventilation Fan Operation Verification
  • PRO-F-48 R00 Room Air Balancing Report (Editable)
  • PRO-F-49 R01 Pipe Pressure Test Report
  • PRO-F-50 R01 Pump Test Run Checklist
  • PRO-F-51 R01 Pump Operation Verification
  • PRO-F-52 R00 Control Panel Installation Verification
  • PRO-F-53 R00 Distribution Board Installation Verification
  • PRO-F-54 R00 Light Installation Verification
  • PRO-F-55 R00 Keluar or Exit Sign Installation Verification
  • PRO-F-56 R00 Light Switches, S.S.O. & Isolator Installation Verification
  • PRO-F-57 R00 Cable, Conduit, Tray, Trunking Installation Verification
  • PRO-F-58 R00 Dehumidifier Installation Verification
  • PRO-F-59 R01 Fan Test Run Checklist
  • PRO-F-60 R00 Duct Flushing Report
  • PRO-F-61 R00 Air Handling Unit & Fan Coil Unit Operation Verification
  • PRO-F-62 R01 Active Passbox Operation Verification
  • PRO-F-63 R00 Passive Passbox Operation Verification
  • PRO-F-64 R00 CDA Filter Installation Verification
  • PRO-F-65-R00 Air Tank Installation Verification
  • PRO-F-66 R00 Compressed Air Pipe Installation Verification
  • PRO-F-67 R01 Sample Identification Tag
  • PRO-F-68 R01 Transmittal
  • PRO-F-69 R00 Control Panel Operation Verification
  • PRO-F-70 R00 Emergency Light & Exit Sign Operation Verification
  • PRO-F-71 R00 Drain Pipe Installation Verification
  • PRO-F-72 R00 Water Tank Installation Verification
  • PRO-F-73 R00 Lights & Switches Operation Verification
  • PRO-F-74 R00 Room Lux Report
  • PRO-F-75 R00 Switchboard & Distribution Board Operation Verification
  • PRO-F-76 R00 Sensor & Controller Installation Verification
  • PRO-F-77 R00 Megger & Continuity Test Checklist
  • PRO-F-78 R00 Extra Low Voltage System Operation Verification
  • PRO-F-79 R00 Sprinkler Pipe Installation Verification
  • PRO-F-80 R01 Fire Damper Installation Verification
  • PRO-F-81 R02 AHU & Filter Chamber Receiving Checklist
  • PRO-F-82 R00 Dampers Receiving Checklist
  • PRO-F-83 R01 Diffusers & Grilles Receiving Checklist
  • PRO-F-84 R01 HEPA Filters & Housing Receiving Checklist
  • PRO-F-85 R01 Lights & Fittings Receiving Checklist
  • PRO-F-86 R01 Diffusers, Grilles & Louvres Installation Verification
  • PRO-F-88 R00 Tool-Box Meeting
  • PRO-F-89 R01 Sprinkler Pipe Pressure Test Report
  • PRO-F-90 R02 Condensing Unit Operation Verification
  • PRO-F-91 R01 HVAC Control System Operation Verification
  • PRO-F-92 R00 Split Unit Installation Verification
  • PRO-F-93 R00 Heat Recovery Wheel Installation Verification
  • PRO-F-94 R00 Cooling Tower Pre-Commissioning Checklist
  • PRO-F-95 R01 Cooling Tower Commissioning Checklist
  • PRO-F-96 R02 Duct Leak Test Report
  • PRO-F-97 R01 Dilapidation Report
  • PRO-F-97 R01 Dilapidation Report (Sample)
  • PRO-F-98 R00 Site Diary
  • PRO-F-99 R00 Document Submittal
  • PRO-F-100 R00 Water Treatment System Installation Verification
  • PRO-F-101 R00 Medical Gas Pipe Installation Verification
  • PRO-F-102 R00 Washroom Accessories & Fittings Installation Verification
  • PRO-F-103 R01 Lead Sheet Installation Verification
  • PRO-F-104 R00 Request For Information
  • PRO-F-105 R00 Stop Work Instruction Notice
  • PRO-F-106 R00 Partial Handover Form
  • PRO-F-107 R00 Site Memo
  • PRO-F-110 R00 CDA Pipe Pressure Test Report
  • PRO-F-111 R00 CDA Pipe Final Flushing Report
  • PRO-F-112 R00 Dynamic Passbox Installation Verification
  • PRO-F-113 R01 Dynamic Passbox Operation Verification
  • PRO-F-114 R02 Project Preparation and Site Readiness Checklist
  • PRO-F-115 R01 Site Demobilization and Handover Checklist
  • PRO-F-116 R00 Site Survey Checklist
  • PRO-F-117 R00 Fan Filter Installation Verification
  • PRO-F-118 R00 Fan Filter Operation Verification
  • PRO-F-119 R00 Laminar Flow Cabinet Installation Verification
  • PRO-F-120 R00 Safety & Health Report – Sample of Safety Report
  • Appendix A – Manpower Report
  • PRO-F-120 R00 Safety & Health Report
  • PRO-F-121 R00 Electrical Receiving Checklist
  • PRO-F-122 R00 Fire System Receiving Checklist
  • PRO-F-123 R00 Pipe & Fittings Receiving Checklist
  • PRO-F-124 R00 Pipe Flushing Checklist
  • PRO-F-125 R00 Flooring Work Preparation Checklist
  • PRO-F-126 R00 Cleanroom Performance Test (CPT) Checklist
  • PRO-F-127 R00 Electrical Testing and Commissioning Form

LUFTER FORM

  • PRO-F-001 R00 Incident Investigation Report
  • PRO-F-001 R00 Incident Investigation Report (Sample)
  • PRO-F-002 R00 Hazard Identification, Risk Assessment and Risk Control
  • PRO-F-002 R00 Hazard Identification, Risk Assessment and Risk Control (Sample)
  • PRO-F-003 R00 Safe Work Method Statement Worksheet
  • PRO-F-003 R00 Safe Work Method Statement Worksheet (Sample)
  • PRO-F-004 R00 Ductwork Checklist
  • PRO-F-004 R00 Ductwork Checklist (Sample)
  • PRO-F-005 R00 Walkie-Talkie Sign Out Form
  • PRO-F-006 R00 Worker Name List
  • PRO-F-007 R00 List of Equipment Tagging
  • PRO-F-008 R00 Validation Checklist 
  • PRO-F-009 R00 Validation Document Summary
  • PRO-F-010 R01 Internal Punch List

SOP

  • DT-SOP-01 R03 Contract Review (WM)

COMPLAINT MANAGEMENT ORGANIZATION CHART

  • Lufter Engineering Department Organization Chart

SOP

  • PPM-SOP-01 R03 Planned Preventive Maintenance (WM)

ISO FORM

  • QA-F-06 R01 PPM Customer Satisfaction Survey
  • PRO-F-06 R04 Service Chit
  • PPM-F-01 R00 Project-PPM Handover Checklist

CTD

SOP

  • CTD-SOP-01 R00 Compliance, Training and Development (WM)

ISO FORM

  • CTD-F-01 R00 External Training Registration Form

QUALITY

QUALITY MANUAL

  • QA-M-01 R13 Lufter Quality Manual (WM)

SOP

  • QA-SOP-01 R04 Control of Documented Information (WM)
  • QA-SOP-02 R02 Management of Change (WM)
  • QA-SOP-03 R04 Customer Satisfaction (WM)
  • QA-SOP-04 R05 Internal Audit (WM)
  • QA-SOP-05 R06 Analysis of Data (WM)
  • QA-SOP-06 R02 Management Review (WM)
  • QA-SOP-07 R04 Corrective Action (WM)
  • QA-SOP-08 R03 Risk Management (WM)

GUIDELINES

  • QA-GD-01 R04 Codification of Documents (WM)

ISO FORM

  • QA-F-01 R02 Change Request Form
  • QA-F-02 R02 Customer Satisfaction Survey
  • QA-F-03 R01 Document Change Notice
  • QA-F-04 R02 Internal Audit Checklist
  • QA-F-05 R03 NCAR form
  • QA-F-06 R01 PPM Customer Satisfaction Survey
POLICIES
  • HR-PCY-02 Company Confidential Policy (WM)
  • HR-PCY-03 Employee Attendance Policy (WM)
  • HR-PCY-18 Social Media Policy (WM)
  • HR-PCY-20 Remote Working Policy (WM)
  • HR-PCY-22 Drugs and Alcohol Policy (WM)
  • HR-PCY-23 Company Provided Accommodation Policy (WM)
  • HR-PCY-24 Sexual Harassment Policy (WM)

CODE OF CONDUCT

  • L-HR-CBDE Code of Business Conduct and Ethics

SOP

  • HR-SOP-01 R06 Training Management (WM)
  • HR-SOP-02 R02 Internal & External Communication (WM)

ISO FORM

  • HR-F-01 R03 New Staff Induction Checklist
  • HR-F-03 R02 Post Training Evaluation and Assessment
  • HR-F-04 R02 Attendance list
  • HR-F-05 R04 Employee Performance Evaluation Form
  • HR-F-06 R00 Training Request Form
  • HR-F-07 R00 On-The-Job Training
  • HR-F-08 R00 Training Record and Evaluation
  • HR-F-09 R00 Reference Check Form
  • HR-F-10 R00 Project Team Performance Evaluation Form

LUFTER FORM

  • HR-F-001 R01 Application For Employment
  • HR-F-003 R00 Interview Evaluation Form
  • HR-F-004 R00 Pre-employment Background Check Consent
  • HR-F-005 R00 Personal Information Update
  • HR-F-006 R00 Employee Account Details
  • HR-F-007 R00 Personnel File document checklist
  • HR-F-008 R00 Personal Data Protection Notice
  • HR-F-009 R00 Distribution of Goods
  • HR-F-010 R01 Exit Interview
  • HR-F-011 R00 Salary and Allowance Adjustment Request
  • HR-F-012 R00 Handover Checklist
  • HR-F-013 R00 Employee Counseling
  • HR-F-014 R01 Carry Forward Leave
  • HR-F-016 R00 Performance Improvement Plan
  • HR-F-017 R00 Form Application For Internship

SOP

  • PUR-SOP-01 R05 Vendor Management (WM)
  • PUR-SOP-02 R04 Purchasing Control (WM)

ISO FORM

  • PUR-F-01 R04 New Vendor Evaluation
  • PUR-F-02 R3 Approved Vendor Evaluation Form
  • PUR-F-03 R03 New Vendor Registration Form
  • PUR-F-04 R04 One Time Vendor Registration Form

LUFTER FORM

  • PUR-F-001 R01 Hardware Request Form
  • PUR-F-002 R02 Stationery Distribution Form

LUFTER FORM

  • ACC-F-002 R01 Project Cash Advance
  • ACC-F-003 Monthly Claim
  • ACC-F-004 Mileage, Toll, Petrol, Parking Claim
  • ACC-F-005 R00 Payment Request

SOP

  • STO-SOP-01 R03 Handling of Stock and Non Stock Items (WM)

ISO FORM

  • STO-F-01 R02 Stock Card
  • STO-F-02 R01 Material Requisition Form

SOP

  • ADM-SOP-01 R05 Maintenance and Calibration Process (WM)

ISO FORM

  • ADM-F-01 R01 Asset Disposal Form

LUFTER FORM

  • ADM-F-001 R00 Flight Booking Request
  • ADM-F-002 R00 Accommodation Booking Request
  • ADM-F-003 R00 Vehicle Inspection Checklist
  • ADM-F-004 R00 Data Logger Checklist
  • ADM-F-005 R01 Alnor Electronic Balancing Tool Checklist
  • ADM-F-006 R00 Computer Checklist
  • ADM-F-007 R00 GoPro MAX Checklist
  • ADM-F-008 R00 Electrical Scissor Lift Checklist
  • ADM-F-010 R00 Printer Checklist
  • ADM-F-011 R01 Duct Leakage Tester (PANDA) Checklist
  • ADM-F-012 R00 Vehicle Records Usage

Training

  • Training 01: Quality Management System and Quality Objectives
  • Training 02: Account Claim Procedure 
  • Training 03: Purchasing Department Briefing
  • Training 04: Good Documentation Practices and Organization
  • Training 01: Site Safety Induction
  • Training 02: Project Department Standard Operating Procedures
  • Training 03: Commissioning and Qualification Plan & Validation
  • Training 04: Project Files and Related Documents
  • Training 05: Project Delivery Process Flow
  • Training 06: Cleanroom Panel Installation
  • Training 07: Ducting System
  • Training 08: Project Preparation and Site Readiness
  • Training 09: HVAC Air Balancing
  • Training 10: Site Demobilization and Handover Process
  • Training 11: Drawing Control
  • Training 12: Project Kick Off Meeting with Design Team
  • Training 13: Project Kick Off Meeting with CTD
  • Training 14: Cleanroom Technical Cleaning
  • Training 01: Design Table Application (Excel) and SAG/RAG Selection
  • Training 02: Psychrometric Chart Application (Manual)
  • Training 03: Ducting Sizing (Manual)
  • Training 04: Understanding of Basic HVAC Design
  • Training 01: Infographic with Microsoft PowerPoint
  • Training 02: Microsoft Project

Beluften Departments

GENERAL

  • FOR-001 Minutes of Meeting
  • FOR-003 Engineering Quotation Template
  • FOR-004 Cleanroom HVAC Balancing Report
  • FOR-005 Sample Format for O&M

LETTER

  • FOR-L-001 Beluften Letterhead
  • FOR-L-002 Denying Liquidated Damage Letter
  • FOR-L-003 Notice of Delays Letter
  • FOR-L-004 Project Handover Letter Template
  • FOR-L-005 Keys Handover Letter Template
  • FOR-L-006 Invitation to CPC Inspection
  • FOR-L-007 Post CPC Inspection
  • FOR-L-008 Invitation to Defect Inspection
  • FOR-L-009 Request for CPC & 1st Moiety

BELUFTEN FORM

  • B-QA-F-02 R02 Customer Satisfaction Survey
  • B-PRO-F-004 R00 Ductwork Checklist
  • B-PRO-F-12 R01 Project Material and Equipment List
  • B-PRO-F-13 R00 Project Report
  • B-PRO-F-14 R00 General Material Receiving Checklist
  • B-PRO-F-15 R00 Condensing Unit Installation Verification
  • B-PRO-F-16 R00 Copper Pipe Installation Verification
  • B-PRO-F-17 R01 Copper Pipe Pressure Test Report
  • B-PRO-F-18 R00 Air Handling Unit & Fan Coil Unit Installation Verification
  • B-PRO-F-19 R00 Differential Pressure Gauge Installation Verification
  • B-PRO-F-20 R01 Filter Chamber Installation Verification
  • B-PRO-F-21 R00 HEPA Filter Installation Verification
  • B-PRO-F-22 R00 Ducting System Installation Verification
  • B-PRO-F-23 R00 Dampers Installation Verification
  • B-PRO-F-24 R00 Ventilation Fan Installation Verification
  • B-PRO-F-25 R00 Active Passbox Installation Verification
  • B-PRO-F-26 R00 Ceiling Installation Verification
  • B-PRO-F-27 R00 Door Installation Verification
  • B-PRO-F-28 R00 Emergency Eyewash & Shower Installation Verification
  • B-PRO-F-29 R00 Epoxy or PU Finished Floor Installation Verification
  • B-PRO-F-30 R00 Furniture & Fittings Installation Verification
  • B-PRO-F-31 R01 Marking Checklist
  • B-PRO-F-32 R00 Passive Passbox Installation Verification
  • B-PRO-F-33 R00 Sink Installation Verification
  • B-PRO-F-34 R01 Tiles Finished Floor & Wall Installation Verification
  • B-PRO-F-35 R01 Viewing Glass Installation Verification
  • B-PRO-F-36 R00 Vinyl Finished Floor Installation Verification
  • B-PRO-F-37 R00 Wall Installation Verification
  • B-PRO-F-38 R00 Door Operation Verification
  • B-PRO-F-39 R02 Drawing Transmittal List
  • B-PRO-F-40 R00 Extra Low Voltage System Installation Verification
  • B-PRO-F-41 R00 Chilled Water Pipe Installation Verification
  • B-PRO-F-42 R00 Cold Water Pipe Installation Verification
  • B-PRO-F-43 R00 Condenser Water Pipe Installation Verification
  • B-PRO-F-44 R00 Hot Water Pipe Installation Verification
  • B-PRO-F-45 R00 Pipe Insulation Installation Verification
  • B-PRO-F-046 R00 Pump & Motor Installation Verification
  • B-PRO-F-47 R01 Ventilation Fan Operation Verification
  • B-PRO-F-48 R00 Room Air Balancing Report (Editable)
  • B-PRO-F-49 R01 Pipe Pressure Test Report
  • B-PRO-F-50 R01 Pump Test Run Checklist
  • B-PRO-F-51 R01 Pump Operation Verification
  • B-PRO-F-52 R00 Control Panel Installation Verification
  • B-PRO-F-53 R00 Distribution Board Installation Verification
  • B-PRO-F-54 R00 Light Installation Verification
  • B-PRO-F-55 R00 Keluar or Exit Sign Installation Verification
  • B-PRO-F-56 R00 Light Switches, S.S.O. & Isolator Installation Verification
  • B-PRO-F-57 R00 Cable, Conduit, Tray, Trunking Installation Verification
  • B-PRO-F-58 R00 Dehumidifier Installation Verification
  • B-PRO-F-59 R01 Fan Test Run Checklist
  • B-PRO-F-60 R00 Duct Flushing Report
  • B-PRO-F-61 R00 Air Handling Unit & Fan Coil Unit Operation Verification
  • B-PRO-F-62 R01 Active Passbox Operation Verification
  • B-PRO-F-63 R00 Passive Passbox Operation Verification
  • B-PRO-F-64 R00 CDA Filter Installation Verification
  • B-PRO-F-65 R00 Air Tank Installation Verification
  • B-PRO-F-66 R00 Compressed Air Pipe Installation Verification
  • B-PRO-F-67 R01 Sample Identification Tag
  • B-PRO-F-68 R00 Transmittal
  • B-PRO-F-69 R00 Control Panel Operation Verification
  • B-PRO-F-70 R00 Emergency Light & Exit Sign Operation Verification
  • B-PRO-F-71 R00 Drain Pipe Installation Verification
  • B-PRO-F-72 R00 Water Tank Installation Verification
  • B-PRO-F-73 R00 Lights & Switches Operation Verification
  • B-PRO-F-74 R00 Room Lux Report
  • B-PRO-F-75 R00 Switchboard & Distribution Board Operation Verification
  • B-PRO-F-76 R00 Sensor & Controller Installation Verification
  • B-PRO-F-77 R00 Megger & Continuity Test Checklist
  • B-PRO-F-78 R00 Extra Low Voltage System Operation Verification
  • B-PRO-F-79 R00 Sprinkler Pipe Installation Verification
  • B-PRO-F-80 R00 Fire Damper Installation Verification
  • B-PRO-F-81 R02 AHU & Filter Chamber Receiving Checklist
  • B-PRO-F-82 R00 Dampers Receiving Checklist
  • B-PRO-F-83 R01 Diffusers & Grilles Receiving Checklist
  • B-PRO-F-84 R01 HEPA Filters & Housing Receiving Checklist
  • B-PRO-F-85 R01 Lights & Fittings Receiving Checklist
  • B-PRO-F-86 R01 Diffusers, Grilles & Louvres Installation Verification
  • B-PRO-F-88 R00 Tool-Box Meeting
  • B-PRO-F-89 R01 Sprinkler Pipe Pressure Test Report
  • B-PRO-F-90 R02 Condensing Unit Operation Verification
  • B-PRO-F-91 R01 HVAC Control System Test Checklist
  • B-PRO-F-92 R00 Split Unit Installation Verification
  • B-PRO-F-93 R00 Heat Recovery Wheel Installation Verification
  • B-PRO-F-94 R00 Cooling Tower Pre-Commissioning Checklist
  • B-PRO-F-95 R01 Cooling Tower Commissioning Checklist
  • B-PRO-F-96 R02 Duct Leak Test Report
  • B-PRO-F-98 R00 Site Diary
  • B-PRO-F-99 R00 Document Submittal
  • B-PRO-F-102 R00 Washroom Accessories & Fittings Installation Verification
  • B-PRO-F-104 R00 Request For Information
  • B-PRO-F-106 R00 Partial Handover Form
  • B-PRO-F-110 R00 CDA Pipe Pressure Test Report
  • B-PRO-F-111 R00 CDA Pipe Final Flushing Report
  • B-PRO-F-112 R00 Dynamic Passbox Installation Verification
  • B-PRO-F-113 R01 Dynamic Passbox Operation Verification
  • PRO-F-114 R02 Project Preparation and Site Readiness Checklist
  • B-PRO-F-116 R00 Site Survey Checklist
  • B-PRO-F-117 R00 Fan Filter Installation Verification
  • B-PRO-F-118 R00 Fan Filter Operation Verification
  • B-PRO-F-119 R00 Laminar Flow Cabinet Installation Verification

COMPLAINT MANAGEMENT ORGANIZATION CHART

  • Beluften – Organization Chart

BELUFTEN FORM

  • PPM-F-02 R04 Service Chit
  • PRO-F-10 R00 Investigation Report

BELUFTEN FORM

  • ACC-F-002 R01 Project Cash Advance
  • ACC-F-003 Monthly Claim
  • ACC-F-004 Mileage, Toll, Petrol, Parking Claim
  • ACC-F-005 R00 Payment Request

BELUFTEN FORM

  • ADM-F-001 R00 Flight Booking Request
  • ADM-F-002 R00 Accommodation Booking Request
  • ADM-F-003 R00 Vehicle Inspection Checklist
  • ADM-F-004 R00 Data Logger Checklist
  • ADM-F-005 R01 Alnor Electronic Balancing Tool Checklist
  • ADM-F-006 R00 Computer Checklist